60 Superlites produced last week (10/4/21-10/7/21)

Status Key

Completed Batch 1

Batch 1 is the first 576 units built.


Batch 2

Batch 2 is a 400 unit build batch that was waiting for tent fabric. The fabric arrived on 7/21/21. Honeycomb panels, extrusion and other build materials are currently in inventory, so all materials are now in hand. This is not your build date, it is the anticipated date the block has all materials required for production.


Batch 3

Batch 3 is a 360 unit build batch with fabric currently scheduled to arrive 9/1/21. We have partial supply of honeycomb panels and poles to begin the block, about 50 units, and resupply of those materials are anticipated to arrive the weeks of 9/1/21-9/13/21. This is not your build date, it is the anticipated date the block has all materials required for production.